IAIA Multipurpose Performing Arts & Fitness Center Construction Update

IAIA Multipurpose Center Construction

The IAIA Multipurpose Performing Arts and Fitness Center is in the final stages of construction and is scheduled to be completed at the end of October. Currently, finishes such as paint, tile, casework, ceilings, and flooring systems are being installed inside the building. The walkable tension wire grid system for the black box theater and the exterior metal wall panels are being installed. Exterior site work including the entry plaza and cast-in place concrete seating walls are also being formed.

You can view a live stream of the construction site on the IAIA website.

  • /