The IAIA Multipurpose Performing Arts and Fitness Center is in the final stages of construction and is scheduled to be completed at the end of October. Currently, finishes such as paint, tile, casework, ceilings, and flooring systems are being installed inside the building. The walkable tension wire grid system for the black box theater and the exterior...
read more